Core of the project · Operation projected for 2030

MULTIPURPOSE
PORT
20 m draft

Capesize up to 300,000 DWT on a natural seabed. Mineral pipeline, rail terminal, and enclosed conveyor belt, serving the southern Andean mining corridor and the bi-oceanic outlet to Bolivia and Brazil.

300M USD
Total CAPEX
2026 Master Plan
18%
Projected IRR
Estimated NPV USD 240M
300,000DWT
Vessel capacity
Capesize class
2030
Projected operation
Studies 2026 → construction 2028
Bathymetry Structural advantage

The deepest draft in southern Peru

The survey records depths of 18 to 27.7 meters off the projected berth line. The design operating draft is set at 20 meters — sustained by the natural seabed, with no initial or maintenance dredging. That saving translates directly into a lower tariff and lower construction risk.

PortCountryDraftClassCapacity
Puerto Pacífico SurPeru20.0 mCapesize20 Mt
MejillonesChile18.0 mCapesize25 Mt
AntofagastaChile16.0 mPanamax18 Mt
IloPeru11.0 mPanamax6 Mt
MataraniPeru9.75 mHandymax7 Mt

Design operating draft. Source: 2026 Master Plan · South Pacific ports benchmark.

Operating model Bulk cargo

36 hours per vessel, end to end

A 6,000 t/h shiploader loads a 180,000 t Capesize vessel in 30 hours of effective operation. Including berthing and unberthing maneuvers, the full cycle per ship is estimated at 36 hours.

6,000t/h
Shiploader capacity
2026 Master Plan
30h
Loading 180,000 t
Standard Capesize
36h
Total cycle per vessel
Incl. maneuvers
43–140M USD
Estimated structural savings
Lower dredging and marine works
Hinterland Mining and bi-oceanic corridor

Who this terminal serves

The catchment area covers the main mining basins of the southern Andes and connects with the bi-oceanic corridor toward Bolivia and western Brazil — the same hinterland logic that underpins neighboring Corío.

Copper

Cerro Verde

~500k t
Copper

Las Bambas

~400k t
Copper

Quellaveco

~300k t
Copper

Toquepala

~200k t
Copper

Cuajone

~180k t
Corridor

Bolivia · Brazil

Bi-oceanic outlet

Reference production volumes. Hinterland: Arequipa, Moquegua, Tacna, Apurímac, Cusco, Puno.

Timeline Roadmap

From studies to operation

2026

Engineering studies, definitive bathymetry, and filings with APN, DICAPI, MTC, and SENACE.

2027

Permits and authorizations. Closing of financial structure and operating partner.

2028

Construction begins: marine works, pier, operations yard.

2030

Projected commercial operation.